新2app:Fukushima debris removal delayed by another year

时间:1个月前   阅读:4

新2appwww.hg9988.vip)实时更新发布最新最快最有效的新2足球网址,新2app下载,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

telegram搜索技巧www.tel8.vip)是一个Telegram群组分享平台,telegram搜索技巧包括telegram搜索技巧、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容,telegram搜索技巧为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

上一篇:1 killed, 4 hurt after car plunges into sea

下一篇:皇冠买球网址:2,636 new Covid cases, 11 deaths

网友评论